FORWARD Orlando Funded through the 2023 USDOT Safe Streets and Roads for All grant, FORWARD Orlando will transform high-need areas for pedestrian safety into dynamic living labs for safety countermeasures, quick-build and demonstration activities.
Downtown Gap Trail The Downtown Gap project will construct a sidewalk-level bicycle lane on the south side of Washington Street from Garland Avenue to Magnolia Avenue. It will also make at-grade railroad crossing improvements at the Sunrail crossing.
2021 ADA Transition Plan Update The city’s Public Works Department and Transportation Department are working in conjunction with a consultant to update the city’s ADA Transition Plan.
Virginia Drive Study The City of Orlando is studying Virginia Drive, from North Orange Avenue to North Mills Avenue, to understand current right-of-way (ROW) constraints and design the ultimate cross section for the roadway, while implementing the vision of the Virginia Drive Special Plan, based on the Virginia /Lake Highland Transportation & Land Use Study.
Southwest Orlando Bike and Pedestrian Study This study will analyze safety and connectivity for people walking and biking in the Southwest Orlando area.
City Sidewalk Construction Soon, the City will make improvements to its pedestrian sidewalks. Improving sidewalk paths will allow constituents to easily transverse neighborhoods and communities while enhancing urban connectivity.
Sanitary Sewer Smoke Testing Smoke testing allows the Water Reclamation Division to pinpoint sanitary sewer deficiencies within the public right-of-way. It also presents an opportunity to locate cross and unauthorized connections to the City's sanitary sewer system.
Proactive City Surveying The city’s Surveying and Engineering Division periodically conducts field surveys to correctly map topography, flood plains, delineate public right-of-way, and inventory public utilities.
City Wide Asphalt Rejuvenation The City of Orlando has identified roadways in your community needing remediation. Pavement Technology, Inc will commence a maltene replacement or asphalt rejuvenation.
Lift Station 2 Force Main Improvements Project Parts A, B, and C The city is proactively and systematically taking steps to improve the sanitary sewer services it provides. The city is committed to reliable and efficient service for our constituents. To maintain that commitment, Public Works will oversee the complete improvement of Lift Station - 2 Force Main.
Summerlin Avenue Improvement Project - Phase I The Summerlin Avenue Improvement Project is a collaborative effort between the City of Orlando and the Orlando Utilities Commission (OUC) to enhance our community's infrastructure. This transformative project encompasses various utility upgrades, including enhancements to OUC's potable water system and the City's sanitary sewer and stormwater systems.
Westmoreland Drive Roadway and Utility Improvements The Westmoreland Drive Roadway and Utility Improvements, led by the City of Orlando and OUC, will modernize aging water, sewer, and stormwater infrastructure from West Colonial Drive to West Church Street.